Manuals / CI/CD Pipelines / Checkpoint 12
E · Advanced Delivery · advanced · Gate · Checkpoint 12 of 12
Checkpoint B — Job-ready pipeline portfolio
Full pipeline portfolio: CI, secrets, cache, environments, gates, rollback docs.
Path progress100%
Step 1 of 1
Pass criteria
- PR + main workflows with test + lint
- Secrets and environments configured safely
- Cache reducing run time (documented)
- Staging deploy job with environment protection
- Branch protection + required checks demonstrated
- ROLLBACK.md + GATES.md + PIPELINE.md complete
Do this now
Walk through repo as interviewer.
Was this step clear?
Chapter learning outcomes
- Pipeline portfolio criteria
Clear these before you leave
Side quest
Portfolio demo
5-min Loom: PR → checks → merge → deploy → show rollback doc.



